Ahmad Razali Saini, Assistant Manager, Changi Airport Group, Singapore

Speaker Biograghy: Ahmad Razali is currently an Assistant Manager in the Engineering & Systems Planning division of Changi Airport Group (CAG), a leading airport company that manages the world's most awarded 'Best Airport', Singapore Changi Airport. He oversees the daily operations and maintenance of the Singapore Changi Airport Terminal 4 baggage handling system (BHS) to ensure a high level of system availability is maintained. Prior to his current appointment, he was a key member of the Terminal 4 BHS project team, and was directly involved in the detailed design, installation, testing and commissioning, and operational readiness and airport transfer (ORAT).


Day 3 - 22 March
Session:
Facilities Maintenance & Management


12:25 - 12:55 - Singapore Changi Airport Terminal 4 baggage handling system project execution
Synopsis: Terminal 4 BHS was a fast-track greenfield project where the installation comprised four main phases, depending on building availability. BIM was used extensively during the detailed design phase to identify and resolve clashes between BHS and building, minimising potential installation delays. After installation completion, the BHS was put through rigorous testings before commissioning for the ORAT to prepare for the opening of T4 in October 2017. This presentation will give the audience an insight into the challenges faced during the different phases of the project implementation, from detailed design phase to ORAT, before transitioning into operations and maintenance after T4 opens.

Audience will learn: